Dashboard

– · day
Reset
Open Work Orders
0
in the selected window
At-Risk
0
0 at risk — all clear
Capacity Used
Material-Ready
0 / 0
all BOM materials staged
On-Time
not past their completion date
A work order is At-Risk if it has a material shortage, sits on an over-capacity machine, or is past its planned completion date.
1

At-Risk Work Orders

3
only WOs needing attention · full list in Planning
Work Order Qty Status Planned Completion Material Why at risk
Kunal Bansal Product 1 3 Unit 1 Pending 10 Jan 2026 Ready Risk Reasons 1
Sneha Kapoor Product 2 10 Unit 2 Pending 11 Feb 2026 Ready Risk Reasons 2
Vikram Nair Product 3 17 Unit 3 Completed 12 Mar 2026 Ready Risk Reasons 3
2

Production Schedule

0
On track At-risk
Nothing to place on the timeline
Work orders need a planned date, stage times, or a completion date to appear here.
3

Capacity Load

3
planned hours vs available in window
Kunal Bansal Overloaded Used 1 / Available 1 hrs · Pct 1%
Sneha Kapoor Overloaded Used 2 / Available 2 hrs · Pct 2%
Vikram Nair Overloaded Used 3 / Available 3 hrs · Pct 3%
4

Material Readiness & Alerts

3
Alerts
Title 1
Msg 1
Tag 1
Title 2
Msg 2
Tag 2
Title 3
Msg 3
Tag 3
Material Shortages
Kunal Bansal 11 short
Item Required Available Short
Sneha Kapoor 11 short
Item Required Available Short
Vikram Nair 11 short
Item Required Available Short
Likwid AI
Loading...
Which items are below reorder level?
Likwid AI
You have 3 items below reorder level: Cotton Yarn 40s Combed (180 kg left, reorder at 250 kg), Indigo Dye Powder (12 kg left, reorder at 20 kg), and Poly-Cotton Blend Fabric (340 m left, reorder at 500 m). Want me to generate purchase indents for these?
Stock vs. Reorder Level