Open Work Orders
23
in the selected window
At-Risk
4
short, overloaded or past-due
Material-Ready
19 / 23
all BOM materials staged
On-Time
87%
not past their completion date
A work order is At-Risk if it has a material shortage, sits on an over-capacity machine, or is past its planned completion date.
| Work Order |
Qty |
Status |
Planned |
Completion |
Material |
Why at risk |
| WO-2026-0871Denim Fabric 12oz |
4,200 mtr |
In Progress |
19 Aug 2026 |
24 Aug 2026 |
Short (Indigo Dye Stock) |
Material Shortage |
| WO-2026-0874Cotton Yarn 30s Combed |
1,800 kg |
Pending |
21 Aug 2026 |
26 Aug 2026 |
Ready |
Machine Overloaded |
| WO-2026-0866Grey Cloth Suiting |
3,000 mtr |
Delayed |
14 Aug 2026 |
20 Aug 2026 |
Ready |
Past Due |
| WO-2026-0879Polyester Dyed Fabric |
2,450 mtr |
In Progress |
22 Aug 2026 |
29 Aug 2026 |
Short (Polyester Chips) |
Material Shortage |
Rapier Loom #3 Overloaded
98 / 90 hrs · 109%
Ring Frame Spinning #2
72 / 90 hrs · 80%
Jigger Dyeing Unit #1
60 / 75 hrs · 80%
Power Loom Shed B
54 / 90 hrs · 60%
Stenter Finishing Line
38 / 75 hrs · 51%
Alerts
Indigo Dye Stock below reorder point
Blocking WO-2026-0871
Shortage
Rapier Loom #3 over capacity
109% load this window
Overloaded
WO-2026-0866 past completion date
4 days overdue
Delayed
Material Shortages
WO-2026-0871 · Denim Fabric 12oz 1 short
| Item | Required | Available | Short |
| Indigo Dye Stock | 420.00 kg | 265.00 kg | 155.00 kg |
WO-2026-0879 · Polyester Dyed Fabric 1 short
| Item | Required | Available | Short |
| Polyester Chips | 980.00 kg | 710.00 kg | 270.00 kg |